Carson City area road report for week of Nov. 14-20
Here is the Carson City area road report for the week of Nov. 14-20, 2022. Closures are expected at the following locations due to road and utility work:
— Caroline Street between Valley Street and Anderson Street will be closed, Monday through Thursday, 7:00am to 5:30pm for roadway reconstruction.
— Curry Street between Spear Street and Telegraph Street will be closed, Saturday, 6:00am to 6:00pm for a special event.
— Overland Street between Voltaire Street and Cochise Street will be closed, Monday through Friday, 7:00am to 7:00pm for utility work.
— Spear Street between Carson Street and Curry Street will be closed, Saturday, 6:00am to 6:00pm for a special event.
— Telegraph Street between Carson Street and Curry Street will be closed, Saturday, 6:00am to 6:00pm for a special event.
Lane restrictions are expected at the following locations due to road/utility work:
US 50 between Russell Way and Airport Road will have lane and shoulder closures in the eastbound direction, Monday through Friday, 7:00pm to 6:00am for roadway and sidewalk reconstruction. Work zone speed limits will be reduced to 35 miles per hour, and drivers should expect minor delays. Pedestrians must use existing crosswalks to detour to the north side of the street.
— The following streets will have narrowed lanes and shoulder work between Nevada Street and Mountain Street, Monday through Thursday, 7:00am to 5:30pm: Caroline Street, Robinson Street, Spear Street and Telegraph Street.
Anderson Street between Washington Street and Robinson Street will have narrowed lanes, Monday through Thursday, 7:00am to 5:30pm for roadway reconstruction.
— Arrowhead Drive between Technology Way and Lamotte Drive will have reduced lanes, Monday through Friday, 8:00am to 5:00pm for utility work.
— Carson Street at Clearview Drive will have shoulder work, Monday through Thursday, 7:00am to 5:30pm for signal repairs.
— Clearview Drive at Carson Street will have lane reductions, Tuesday through Thursday, 7:00am to 5:30pm for signal repairs.
Curry Street between 5th Street and Musser Street will have narrowed lanes, Monday through Thursday, 7:00am to 5:30pm for roadway improvements.
— Dyer Lane from Northgate Lane to the cul-de-sac will have narrowed lanes, Monday through Friday, 8:00am to 5:00pm for utility work.
— 5th Street between Saliman Road and Warm Springs Road will be reduced to one lane with flaggers, Monday through Friday, 7:00am to 6:00pm for utility work.
— Hamilton Avenue between Bullion Drive and Belmont Avenue will have shoulder work, Monday through Friday, 9:00am to 5:00pm for utility work.
— Musser Street between Plaza Street and Stewart Street will have narrowed lanes, Monday through Thursday, 7:00am to 5:30pm for roadway reconstruction.
— Sheep Drive between Deer Run Road and Asphalt Drive will be reduced to one lane with flaggers, Monday through Friday, 7:00am to 4:00pm for utility work.
— Stewart Street between Telegraph Street and Musser Street will have lane reductions, Monday through Thursday, 7:00am to 5:30pm for roadway reconstruction.